html-poster-español

html-poster-espanol forgejo

Notes

Review 4
  • Verdict: APPROVED

    Re-review of board item #1413 after refinement. Prior review: review-1413-2026-06-11 (NEEDS_REFINEMENT). All 4 [BODY] recommendations have been addressed. Both [SCOPE] items resolved or accepted.

    Template Completeness

    • [x] Type -- Feature
    • [x] Lineage -- Equivalente a html-poster#3
    • [x] Repo -- html-poster-espanol, pal-e-services, pal-e-deployments (all 3 now listed)
    • [x] User Story -- present, well-formed
    • [x] Context -- present, references Fase 1 prerequisite (completed)
    • [x] File Targets -- present, complete (see below)
    • [x] Feature Flag -- None (appropriate for infra work)
    • [x] Acceptance Criteria -- present, 9 items
    • [x] Test Expectations -- present
    • [x] Constraints -- present
    • [x] Checklist -- present, 10 items covering all 3 repos
    • [x] Related -- present

    Traceability

    • [x] story:demostrar-pipeline label -- "Como practicante de DevOps, quiero que el codigo se construya, pruebe y despliegue automaticamente"
    • [x] story entry verified -- found in project-html-poster-espanol user-stories section (listed as "pendiente", accepted as intentional for foundational work)
    • [x] arch:ci-pipeline label -- CI/CD pipeline component
    • [x] arch note verified -- arch-ci-pipeline-html-poster-espanol exists in pal-e-docs (created after prior review), covers all 3 repos and flow
    • [x] Forgejo issue -- ldraney/html-poster-espanol#3, open

    File Targets

    html-poster-espanol (repo principal):

    • [x] .woodpecker.yaml (new) -- verified: does not exist on main. Reference pattern at landscaping-assistant/.woodpecker.yaml confirmed.
    • [x] Dockerfile (new) -- verified: does not exist on main. Reference pattern at landscaping-assistant/Dockerfile confirmed.
    • [x] bin/docker-entrypoint (new) -- verified: does not exist on main. Reference pattern at landscaping-assistant/bin/docker-entrypoint confirmed. FIXED from prior review (was missing from file targets).

    pal-e-services (Terraform):

    • [x] terraform/k3s.tfvars -- verified: file exists at /home/ldraney/pal-e-services/terraform/k3s.tfvars. No html-poster-espanol entry yet (correct, will be added). FIXED from prior review (path now specific).

    pal-e-deployments (Kustomize):

    • [x] overlays/html-poster-espanol/prod/kustomization.yaml (new) -- verified: directory does not exist yet. Reference pattern at overlays/landscaping-assistant/prod/ confirmed (contains kustomization.yaml, deployment-patch.yaml). FIXED from prior review (was entirely missing).
    • [x] overlays/html-poster-espanol/prod/deployment-patch.yaml (new) -- verified: same as above.

    Repo Placement

    OK. Issue is filed on html-poster-espanol (the primary repo). All 3 affected repos are now explicitly documented in the Repo section and File Targets section. Single coordinating issue is appropriate since the 3 repo touches are tightly coupled. FIXED from prior review.

    Dependencies

    • Board item #1412 (Fase 1: Scaffold Rails) -- DONE, prerequisite satisfied
    • Board item #1414 (Fase 3: Observabilidad) -- depends on this ticket (blocked by #1413)
    • No undocumented blockers. Harbor registry and Woodpecker are platform-level services already operational.

    Acceptance Criteria

    9 acceptance criteria. All are verifiable:

    • .woodpecker.yaml con lint, test, build+push via kaniko -- verifiable by file inspection
    • Dockerfile multi-etapa funcional -- verifiable by docker build
    • bin/docker-entrypoint presente y ejecutable -- verifiable by stat/ls (ADDED from prior review)
    • Entrada en var.services -- verifiable by grep k3s.tfvars
    • Overlay de Kustomize -- verifiable by file inspection (ADDED from prior review)
    • Pipeline verde al hacer push a main -- verifiable via Woodpecker API post-merge
    • Imagen en Harbor -- verifiable via Harbor API
    • ArgoCD sincroniza pod -- verifiable via kubectl/ArgoCD
    • URL publica en vivo -- verifiable via curl

    Complete and testable. The addition of bin/docker-entrypoint and overlay criteria from prior review addresses the previous gaps.

    Blast Radius

    Low blast radius. Entirely additive infrastructure (new files in html-poster-espanol, new entry in k3s.tfvars, new overlay directory). No existing services modified. 14 other overlays exist in pal-e-deployments -- the pattern is well-established. No downstream consumers affected.

    Decomposition Assessment

    9 AC across 3 repos exceeds the 5-minute thresholds on paper. However, per prior review assessment (still valid): the work is highly mechanical pattern-adaptation from landscaping-assistant, and the 3 repo touches are tightly coupled in sequence (build files -> Terraform onboarding -> deployment overlay). Decomposing would add coordination overhead without benefit. No decomposition needed.

    Prior Review Recommendations -- Resolution

    • [BODY] Add bin/docker-entrypoint to File Targets -- RESOLVED: now listed under html-poster-espanol targets
    • [BODY] Specify terraform/k3s.tfvars path -- RESOLVED: now specific path instead of vague reference
    • [BODY] Add pal-e-deployments overlay target -- RESOLVED: kustomization.yaml and deployment-patch.yaml now listed
    • [BODY] Document all 3 repos explicitly -- RESOLVED: Repo section now lists all 3, File Targets organized by repo
    • [SCOPE] Create arch note arch-ci-pipeline -- RESOLVED: arch-ci-pipeline-html-poster-espanol created with full coverage of all 3 repos and flow
    • [SCOPE] Create story note or accept pendiente -- ACCEPTED: story entry exists on project page as pendiente, appropriate for foundational work

    Recommendation

    No action needed. All prior findings addressed. Ticket is ready for implementation.

  • Verdict: NEEDS_REFINEMENT

    Template Completeness

    • [x] Type -- Feature
    • [x] Lineage -- Equivalente a html-poster#3
    • [x] Repo -- html-poster-espanol
    • [x] User Story -- present, well-formed
    • [x] Context -- present, references Fase 1 prerequisite
    • [x] File Targets -- present but incomplete (see below)
    • [x] Feature Flag -- None (appropriate for infra work)
    • [x] Acceptance Criteria -- present, 7 items
    • [x] Test Expectations -- present
    • [x] Constraints -- present
    • [x] Checklist -- present
    • [x] Related -- present

    Traceability

    • [x] story:demostrar-pipeline label -- "Como practicante de DevOps, quiero que el codigo se construya, pruebe y despliegue automaticamente"
    • [ ] story note MISSING -- story-html-poster-espanol-demostrar-pipeline listed as "pendiente" in project page, no dedicated note exists. [SCOPE] Create story note or accept "pendiente" status as intentional.
    • [x] arch:ci-pipeline label -- CI/CD pipeline component
    • [ ] arch note MISSING -- No arch-ci-pipeline note found in pal-e-docs. [SCOPE] Create architecture note arch-ci-pipeline for the CI/CD pipeline component.
    • [x] Forgejo issue -- ldraney/html-poster-espanol#3, open

    File Targets

    • [x] .woodpecker.yaml (new) -- verified: does not exist yet on remote main. Reference pattern exists at landscaping-assistant/.woodpecker.yaml.
    • [x] Dockerfile (new) -- verified: does not exist yet on remote main. Reference pattern exists at landscaping-assistant/Dockerfile.
    • [ ] bin/docker-entrypoint -- ISSUE: Not listed as a file target, but the landscaping-assistant Dockerfile (reference pattern) copies and runs /rails/bin/docker-entrypoint. This file does not exist on remote main. Must be added to file targets. [BODY]
    • [ ] Terraform target is vague -- ISSUE: Says "agregar a var.services en pal-e-services" but should specify the exact file path: pal-e-services/terraform/k3s.tfvars. [BODY]
    • [ ] pal-e-deployments overlay MISSING -- ISSUE: The landscaping-assistant service entry in k3s.tfvars uses source_repo = "ldraney/pal-e-deployments" and source_path = "overlays/landscaping-assistant/prod". An equivalent overlay directory (overlays/html-poster-espanol/prod/) with kustomization.yaml and deployment-patch.yaml is needed but not mentioned in file targets. [BODY]

    Repo Placement

    Issue is filed on html-poster-espanol but the work spans 3 repos:

    • ldraney/html-poster-espanol -- .woodpecker.yaml, Dockerfile, bin/docker-entrypoint
    • ldraney/pal-e-services -- terraform/k3s.tfvars (add service entry)
    • ldraney/pal-e-deployments -- overlays/html-poster-espanol/prod/ (new kustomize overlay)

    The issue only acknowledges html-poster-espanol and vaguely references pal-e-services. pal-e-deployments is not mentioned at all. Multi-repo scope should be explicitly documented. Consider whether separate Forgejo issues are needed per repo or whether a single coordinating issue is acceptable.

    Dependencies

    • Board item #1412 (Fase 1: Scaffold Rails) -- DONE, prerequisite satisfied
    • Board item #1414 (Fase 3: Observabilidad) -- depends on this ticket (blocked by #1413)
    • No undocumented blockers found. Harbor registry and Woodpecker are platform-level services already operational (used by landscaping-assistant).

    Acceptance Criteria

    7 acceptance criteria. Most are verifiable by an agent:

    • "Pipeline verde al hacer push a main" -- requires actual push + pipeline execution, verifiable post-merge
    • "Imagen en Harbor" -- verifiable via Harbor API
    • "ArgoCD sincroniza pod" -- verifiable via kubectl/ArgoCD API
    • "URL publica en vivo via Tailscale funnel" -- verifiable via curl

    Missing criterion: bin/docker-entrypoint exists and is executable. Also missing: pal-e-deployments overlay exists and ArgoCD can read it.

    Blast Radius

    Low blast radius. This is additive infrastructure (new files, new Terraform entry). No existing services are modified. The pattern is proven via landscaping-assistant. Only risk: if the Terraform service map variable shape changes, but this follows the established pattern exactly.

    Decomposition Assessment

    7 acceptance criteria across 3 repos. This exceeds the 5-minute rule thresholds (>3 file targets across >2 repos, >5 AC). However, the work is highly mechanical -- adapting proven patterns from landscaping-assistant. The three repo touches are tightly coupled (Dockerfile/pipeline produce the image, Terraform onboards the service, deployments overlay configures ArgoCD). Decomposing into sub-tickets may add coordination overhead without benefit.

    Recommendation: Accept as a single ticket IF file targets are corrected to enumerate all 3 repos explicitly. The agent can execute sequentially: (1) add files to html-poster-espanol, (2) add entry to pal-e-services k3s.tfvars, (3) add overlay to pal-e-deployments. No decomposition needed if scope is clarified.

    Recommendations

    • [BODY] Add bin/docker-entrypoint to File Targets (new file, adapt from landscaping-assistant)
    • [BODY] Change Terraform target from vague "agregar a var.services en pal-e-services" to specific: pal-e-services/terraform/k3s.tfvars -- add html-poster-espanol entry to services map
    • [BODY] Add pal-e-deployments file target: create overlays/html-poster-espanol/prod/ with kustomization.yaml and deployment-patch.yaml (adapt from landscaping-assistant overlay)
    • [BODY] Document all 3 affected repos explicitly in the File Targets section
    • [SCOPE] Create architecture note arch-ci-pipeline for the CI/CD pipeline component
    • [SCOPE] Create story note story-html-poster-espanol-demostrar-pipeline or accept "pendiente" status
  • Verdict: APPROVED

    Re-review of board item #1412 after refinement. All three issues from review-1412-2026-06-11 have been resolved.

    Previous Issues Resolution

    • [x] Project page created -- project-html-poster-espanol exists with user-stories section containing publicar-contenido entry
    • [x] arch-rails-views note confirmed -- exists in pal-e-docs (original finding was false positive; note was already present)
    • [x] Issue body updated -- app/views/pages/acerca.html.erb added to File Targets; GET /acerca added to Test Expectations

    Template Completeness

    • [x] Type -- Feature
    • [x] Lineage -- references html-poster#2
    • [x] Repo -- html-poster-espanol
    • [x] User Story -- clear actor/goal/benefit
    • [x] Context -- explains Fase 1 motivation, references existing ereccion.html
    • [x] File Targets -- 7 files listed, all marked nuevo (includes acerca.html.erb)
    • [x] Feature Flag -- None (appropriate for greenfield scaffold)
    • [x] Acceptance Criteria -- 5 items
    • [x] Test Expectations -- 4 items (docker compose, GET /, GET /acerca, GET /ereccion.html)
    • [x] Constraints -- rails-base pattern, PostgreSQL
    • [x] Checklist -- 6 items
    • [x] Related -- references html-poster#2

    Traceability

    • [x] story:publicar-contenido label -- present on board item
    • [x] story note verified -- publicar-contenido entry found in project-html-poster-espanol user-stories section
    • [x] arch:rails-views label -- present on board item
    • [x] arch note verified -- arch-rails-views note exists in pal-e-docs
    • [x] Forgejo issue -- https://forgejo.tail5b443a.ts.net/ldraney/html-poster-espanol/issues/2, open

    File Targets

    • [x] docker-compose.yml -- nuevo, confirmed does not exist. Pattern source (ldraney/rails-base) verified on Forgejo.
    • [x] app/controllers/pages_controller.rb -- nuevo, confirmed does not exist
    • [x] app/views/pages/inicio.html.erb -- nuevo, confirmed does not exist
    • [x] app/views/pages/acerca.html.erb -- nuevo, confirmed does not exist (added in refinement)
    • [x] app/views/layouts/application.html.erb -- nuevo, confirmed does not exist
    • [x] config/routes.rb -- nuevo, confirmed does not exist
    • [x] config/database.yml -- nuevo, confirmed does not exist
    • [x] public/ereccion.html -- referenced in AC, confirmed exists (static HTML page)

    Repo Placement

    OK. Issue filed on html-poster-espanol, all file targets within same repo. Single-repo scope.

    Dependencies

    No blockers. Board items #1413 (Fase 2 CI/CD) and #1414 (Fase 3 observabilidad) are downstream -- they depend on this Fase 1 completing but do not block it. No in_progress items conflict.

    Acceptance Criteria

    5 AC items, all agent-verifiable:

    • docker compose up -- verifiable via shell
    • PagesController with inicio and acerca actions -- verifiable via file read and HTTP GET
    • ereccion.html accessible in public/ -- verifiable via HTTP GET
    • Dynamic views rendering within layout -- verifiable via HTTP GET and response body check
    • localhost:9999 verification -- verifiable via curl

    Blast Radius

    Greenfield scaffold -- minimal blast radius. No existing application code to break. The rails-base template repo exists on Forgejo (ldraney/rails-base) and is the stated pattern source. No downstream consumers yet.

    Decomposition Assessment

    7 file targets in 1 repo, 5 AC. Standard Rails scaffold -- all files are tightly coupled and belong in a single agent pass. Estimated agent time: under 5 minutes. No decomposition needed.

    Recommendation

    No action needed. Ticket is ready for implementation.

  • Verdict: NEEDS_REFINEMENT

    Template Completeness

    • [x] Type -- Feature
    • [x] Lineage -- references html-poster#2
    • [x] Repo -- html-poster-espanol
    • [x] User Story -- present, clear actor/goal/benefit
    • [x] Context -- explains Fase 1 motivation, references existing ereccion.html
    • [x] File Targets -- 6 files listed, all marked nuevo
    • [x] Feature Flag -- None (appropriate for scaffold)
    • [x] Acceptance Criteria -- 5 items
    • [x] Test Expectations -- 3 items
    • [x] Constraints -- rails-base pattern, PostgreSQL
    • [x] Checklist -- 6 items
    • [x] Related -- references html-poster#2

    Traceability

    • [x] story:publicar-contenido label -- present on board item
    • [ ] story note MISSING -- [SCOPE] Project page project-html-poster-espanol does not exist in pal-e-docs. Create project page with user-stories section including publicar-contenido story.
    • [x] arch:rails-views label -- present on board item
    • [ ] arch note MISSING -- [SCOPE] Create architecture note arch-rails-views for the Rails views component.
    • [x] Forgejo issue -- https://forgejo.tail5b443a.ts.net/ldraney/html-poster-espanol/issues/2, open

    File Targets

    • [x] docker-compose.yml -- nuevo, confirmed does not exist yet. Pattern source (ldraney/rails-base) verified to exist on Forgejo.
    • [x] app/controllers/pages_controller.rb -- nuevo, confirmed does not exist
    • [x] app/views/pages/inicio.html.erb -- nuevo, confirmed does not exist
    • [x] app/views/layouts/application.html.erb -- nuevo, confirmed does not exist
    • [x] config/routes.rb -- nuevo, confirmed does not exist
    • [x] config/database.yml -- nuevo, confirmed does not exist
    • [x] public/ereccion.html -- referenced in AC, confirmed exists (static HTML page)

    Repo Placement

    OK. Issue filed on html-poster-espanol, all file targets are within the same repo. Single-repo scope.

    Dependencies

    No blockers. Board items #1413 (Fase 2 CI/CD) and #1414 (Fase 3 observabilidad) are downstream -- they depend on this Fase 1 completing but do not block it. No in_progress items conflict.

    Acceptance Criteria

    5 AC items, all agent-verifiable:

    • docker compose up -- verifiable via shell
    • PagesController with inicio and acerca actions -- verifiable via file read and HTTP GET
    • ereccion.html accessible in public/ -- verifiable via HTTP GET
    • Dynamic views rendering within layout -- verifiable via HTTP GET and response body check
    • localhost:9999 verification -- verifiable via curl

    Note: AC mentions "acerca" action but File Targets only list inicio.html.erb view -- missing app/views/pages/acerca.html.erb.

    Blast Radius

    Greenfield scaffold -- minimal blast radius. No existing application code to break. The rails-base template repo exists on Forgejo (ldraney/rails-base) and is the stated pattern source. No downstream consumers yet.

    Decomposition Assessment

    6 file targets in 1 repo, 5 AC. This is a standard Rails scaffold -- all files are tightly coupled and belong in a single agent pass. Estimated agent time: under 5 minutes. No decomposition needed.

    Recommendations

    • [SCOPE] Create project page project-html-poster-espanol in pal-e-docs with user-stories section including publicar-contenido story.
    • [SCOPE] Create architecture note arch-rails-views for the Rails views component.
    • [BODY] Add missing file target: app/views/pages/acerca.html.erb (AC references "acerca" action but no view file is listed).
Doc 1
  • Arquitectura: Pipeline CI/CD arch-ci-pipeline-html-poster-espanol

    Pipeline CI/CD — html-poster-español

    Sigue el patrón probado de landscaping-assistant. Tres repos involucrados:

    html-poster-espanol (código)

    • .woodpecker.yaml — Pipeline CI: clone, bundle install, rubocop, rspec, kaniko build+push
    • Dockerfile — Multi-etapa: ruby-rails-build (compilación) + ruby-rails-runtime (producción)
    • bin/docker-entrypoint — Script de entrada del contenedor

    pal-e-services (Terraform)

    • terraform/k3s.tfvars — Entrada en var.services crea: namespace, pipeline Woodpecker, app ArgoCD, ServiceMonitor, Tailscale funnel

    pal-e-deployments (Kustomize)

    • overlays/html-poster-espanol/prod/ — kustomization.yaml + deployment-patch.yaml para el despliegue en k8s

    Flujo

    Push a main → Woodpecker CI (lint, test, build) → kaniko push a Harbor → ArgoCD Image Updater detecta nuevo tag → ArgoCD sincroniza pod → Tailscale funnel expone URL pública.

Project Page 1
  • html-poster-español — Página de Proyecto project-html-poster-espanol

    Vision

    App Rails para publicar páginas HTML independientes en español en la plataforma pal-e. Demuestra que el pipeline completo de devops funciona para un servicio nuevo desde cero — con métricas DORA medidas desde el primer despliegue. El éxito es: contenido en español publicado en una URL pública con observabilidad completa.

    User Stories

    Key Story Note Role Success Metric
    publicar-contenido story-html-poster-espanol-publicar-contenido (pendiente) Autor Páginas HTML en español accesibles públicamente vía Tailscale funnel
    demostrar-pipeline story-html-poster-espanol-demostrar-pipeline (pendiente) Practicante DevOps Pipeline verde, métricas DORA visibles en Grafana desde día uno

    Architecture

    1. Modelo de Dominio (pendiente) — entidades y relaciones
    2. Flujo de Datos (pendiente) — cómo se mueve la información
    3. Despliegue (pendiente) — dónde corren los servicios

    Rails 8.1 + Puma desplegado en k8s vía ArgoCD. Contenido servido estáticamente (public/) y dinámicamente (PagesController). PostgreSQL gestionado por CNPG.

    Board

    Tablero primario: board-html-poster-espanol

    Status

    Fase 1 completada (PR #5, 2026-06-12). App Rails scaffold con PagesController (inicio, acerca), layout con tema oscuro, docker-compose funcional, 11 tests pasando. Contenido estático (ereccion.html) servido. Siguiente: Fase 2 (pipeline CI/CD).

    Milestones

    • 2026-06-12 — Fase 1 completada: scaffold Rails + publicaciones estáticas (PR #5)

    Repos

    Repo Plataforma Rol Estado
    html-poster-espanol Forgejo Repo principal Activo
Board 1