Review: T9: fix Queens practice schedule (Fri→Wed)

review-811-2026-04-03 Doc

review approved

Verdict: APPROVED

Updated 2026-04-04: Reviewer found fix already present in local checkout. This is because an earlier manual edit was applied to the 29-queens-reassignment-clause feature branch. The fix is NOT on main and NOT deployed. The deployed contract page still shows Friday BWill. T9 is still needed — agent must apply to a branch from main, PR, merge, deploy.
Arch note exists at arch-contracts-westside-basketball (full slug). Reviewer searched short form.

Template Completeness

All sections present. Type should be Bug (matches board label), not Feature — minor.

Traceability

  • [x] story:WS-S20 — confirmed in project-westside-basketball parent stories
  • [x] arch:contracts — note exists: arch-contracts-westside-basketball
  • [x] Forgejo issue — westside-contracts#40, open

Scope

1 line change, 1 file, 1 repo. ~1 min agent time. Must branch from origin/main (local checkout is on a feature branch).

Agent Instruction

IMPORTANT: Clone fresh from origin or ensure checkout is on main before branching. The local ~/westside-contracts is on branch 29-queens-reassignment-clause which already has this edit. The agent must apply to main.