Review: CI pipeline: Woodpecker build + Harbor push
Verdict: NEEDS_REFINEMENT
Template Completeness
- [x] Type — Feature
- [x] Lineage — "Prerequisite for #21 (validation). Enables automated builds."
- [x] Repo —
forgejo_admin/twitch-2k-wager - [x] User Story — clear developer-facing story for CI automation
- [x] Context — references existing patterns, names Harbor project, links to sibling repos
- [x] File Targets —
.woodpecker.yamlto create;Dockerfileexplicitly excluded - [x] Acceptance Criteria — 6 testable items
- [x] Test Expectations — 3 items covering trigger, completion, and image visibility
- [x] Constraints — pattern matching, Harbor credentials, Woodpecker activation noted
- [x] Checklist — standard 3-item checklist
- [x] Related — project page, arch note, downstream issue, SOP linked
All template sections present and filled.
Traceability
- [x] story:challenger-auth label — Challenger Twitch Login
- [x] story note verified —
story-twitch-2k-wager-challenger-auth(id 1157) exists in pal-e-docs;challenger-authkey listed inproject-twitch-2k-wageruser-stories table - [x] arch:deployment-twitch-2k-wager label — Deployment architecture
- [x] arch note verified —
arch-deployment-twitch-2k-wager(id 1156) exists in pal-e-docs with full Mermaid diagram and component table - [x] Forgejo issue — forgejo_admin/twitch-2k-wager#22, state: open
Traceability triangle complete. All backing notes exist.
File Targets
- [x]
.woodpecker.yaml— confirmed does NOT exist in repo (create target valid). Repo root contains: Dockerfile, package.json, src/, svelte.config.js, etc. - [x]
Dockerfile— confirmed exists in repo (do-not-touch constraint valid, created by #8)
Targets are specific. Agent knows exactly what to create and what not to touch.
Repo Placement
OK. Issue filed on
forgejo_admin/twitch-2k-wager, file target (.woodpecker.yaml) belongs in the same repo. No cross-repo file changes needed. The update-kustomize-tag step (see Dependencies) modifies pal-e-deployments at runtime via script, not as a code change in this PR.Dependencies
- [x] #21 (Validation: end-to-end flow) — documented downstream dependency (depends on this ticket). Open. Correct.
- [x] #8 (SvelteKit scaffold + Dockerfile) — board item #794, in
needs_approval. Provides the Dockerfile this pipeline builds. Implicitly referenced ("Dockerfile already exists from #8") but not listed as a blocking dependency. - [ ] #3 (Kustomize overlay in pal-e-deployments) — board item #788, in
needs_approval. UNDOCUMENTED DEPENDENCY. Reference pipelines (basketball-api, westside-app) all include anupdate-kustomize-tagstep that pushes the new image tag to the pal-e-deployments kustomize overlay. This step requires the overlay directory to exist. The issue does not mention this step or this dependency.
Acceptance Criteria
6 AC items evaluated:
- [x] ".woodpecker.yaml follows existing platform CI pattern" — testable by diff against reference pipelines
- [x] "Pipeline triggers on push to main" — testable via Woodpecker MCP tools
- [x] "Docker image builds using existing Dockerfile" — testable via pipeline status
- [ ] "Image pushed to playme2k/app:latest and playme2k/app:{commit-sha}" — ISSUE: reference pipelines (basketball-api, westside-app) only tag with
${CI_COMMIT_SHA}. No:latesttag. Either AC is wrong or this is an intentional deviation that should be documented in Constraints. - [x] "Woodpecker repo activated with Harbor robot credentials as secrets" — testable via mcp__woodpecker tools
- [x] "First pipeline run succeeds" — testable via pipeline trigger + status check
Missing AC: No criterion for the
update-kustomize-tag step. Every platform pipeline includes this step (downloads shared script from pal-e-platform, pushes new tag to pal-e-deployments overlay). This is a standard platform pattern omitted from scope.Blast Radius
Low.
.woodpecker.yaml is self-contained to this repo. Harbor project playme2k and robot accounts already provisioned per pal-e-services PR #54. No downstream services consume this image yet (kustomize overlay not yet deployed). No sibling services affected. Rollback is trivial (revert one file).Decomposition Assessment
Apply three-thing limit and five-minute rule:
- Discrete changes: 1 file to create + Woodpecker repo activation + secret setup = 3 things. At the limit but acceptable.
- Estimated agent time: Under 5 minutes. Standard CI onboarding pattern, well-documented by reference pipelines.
- Parallelizable subtasks: None — file creation, activation, and verification are sequential.
No decomposition needed.
Recommendation
[BODY]Fix AC: remove:latesttag reference or explicitly add:latestas a second Kaniko tag and document the deviation from reference pipelines in Constraints.[BODY]Add AC forupdate-kustomize-tagstep: "Pipeline includes update-kustomize-tag step that pushes image tag to pal-e-deployments overlay."[BODY]Add dependency on #3 (Kustomize overlay) in Lineage or Related section. Theupdate-kustomize-tagstep will fail if the overlay directory does not exist in pal-e-deployments.[BODY]Add constraint: "Must include update-kustomize-tag step matching platform pattern (downloads shared script from pal-e-platform, requires OVERLAY and IMAGE_TAG env vars, depends_on build-and-push)."