Review: tofu apply -- provision prediction-assistant infra

review-1772-2026-07-05 Review

review ready

Verdict: READY

Template Completeness

  • [x] Type -- Feature
  • [x] Lineage -- dependencies on services terraform, Keycloak, CNPG database
  • [x] Repo -- ldraney/pal-e-services
  • [x] User Story -- present
  • [x] Context -- present, explains post-merge apply workflow
  • [x] File Targets -- present (correctly states "none" for execution task)
  • [x] Feature Flag -- none (correct for infra work)
  • [x] Acceptance Criteria -- 5 items, all verifiable
  • [x] Test Expectations -- present with run command
  • [x] Constraints -- present (merge order, kubeconfig access)
  • [x] Checklist -- present
  • [x] Related -- present

Traceability

  • [x] story:platform-setup label -- Platform Setup
  • [x] story note verified -- story-prediction-assistant-platform-setup exists in pal-e-docs (user-story, active, project: prediction-assistant). Listed in project-prediction-assistant user-stories section.
  • [x] arch:iac label -- Infrastructure as Code
  • [x] arch note verified -- arch-iac note exists (type: architecture, status: active, project: prediction-assistant). Contains Mermaid diagram, components table, and key decisions.
  • [x] Forgejo issue -- ldraney/pal-e-services#173, open

File Targets

Issue correctly states "none" -- this is a tofu apply execution task with no file modifications. All terraform files are already merged via upstream dependencies.

Repo Placement

OK. Issue filed on ldraney/pal-e-services, which is where tofu apply runs. The terraform directory and tfvars live in pal-e-services. Correct placement.

Dependencies

  • Upstream (documented in Lineage):
  • Downstream (not documented but inferred):
All upstream dependencies are in validation column (merged, awaiting validation). Lineage section correctly identifies them.

Acceptance Criteria

5 criteria, all machine-verifiable:
  • [x] tofu apply exit code -- directly testable
  • [x] kubectl get ns prediction-assistant -- CLI command, verifiable
  • [x] ArgoCD application check -- verifiable via argocd app get or kubectl
  • [x] Harbor project + robot accounts -- verifiable via Harbor API
  • [x] Keycloak realm and client -- verifiable via Keycloak admin API
All criteria are testable by an agent with cluster access.

Blast Radius

Low. This provisions NEW resources (namespace, Harbor project, ArgoCD app, Keycloak realm, CNPG database) for the prediction-assistant service. No modifications to existing services. Tofu modules are idempotent. Other services in the same cluster are unaffected.

Decomposition Assessment

No decomposition needed. Zero file targets, 5 acceptance criteria (at threshold), single command execution (tofu apply) plus verification. Well under 5-minute rule.

Recommendation

No action needed. Scope is solid, traceability complete, dependencies documented and merged.
Minor observations (non-blocking):
  • The arch-iac note heading still references "kalshi-assistant" (old repo name) rather than "prediction-assistant". Not blocking for this ticket but worth a doc cleanup pass.
  • Issue type is "Feature" but the work is an execution task (no code changes). Functionally correct -- the Checklist item "PR opened" does not apply since there is no PR for a tofu apply. Non-blocking.