Phase 5: Dogfood + Measure

phase-note-decomp-5-dogfood Phase

Goal: Decompose real plans. Measure token savings vs baselines. Prove it works.
Status: COMPLETE — 2026-03-02
Done:
  • Decomposed Note Decomposition plan into 5 child phase notes
  • Decomposed pal-e-sprints plan into 3 child phase notes
  • Decomposed Knowledge System Consolidation plan into 6 child phase notes
  • Decomposed Platform Observability plan into 5 child phase notes
  • All 4 active plans now decomposed (19 total child phases created)
  • All parent plans slimmed to ~2KB summaries pointing to child phases
  • Proved queries work: list_notes(note_type="phase", status="in-progress") = 1KB/1 call (was 193KB/12 calls)
  • Proved phase update works: update_note(slug, status) = 0.5KB/1 call (was 39KB/2 calls)
Measured Results:
Story Before After Savings
Update phase status 39KB, 2 calls 0.5KB, 1 call 98.7%
Query in-progress phases 193KB, 12 calls 1KB, 1 call 99.5%
Read plan summary 15KB 2KB 86.7%
Remaining: PR #63 deploy + browser verification (tracked separately — not blocking plan completion).