Bug: pal-e-app Woodpecker CI check/lint steps fail despite passing locally
Problem
Woodpecker CI pipelines on pal-e-app failed at check/lint steps despite passing locally. Assumed to be K8s backend issue.
Resolution
Resolved as of pipeline 17 (2026-03-14). The push pipeline for PR #13 passes all 7 steps (clone, install, check, lint, build, build-and-push, update-deployment-tag). The original failures (pipelines 7-8) were likely transient K8s backend issues or workspace problems that resolved after subsequent deployments.
Related
plan-pal-e-docs— pal-e-app is the frontend for this projectbug-woodpecker-smoke-test-empty-logs— related investigation that proved pod logs, not K8s backend, were the real issue